Projects

Funicular railway system | South Korea

Funicular Railway System - South Korea

It was POSCO Engineering, a major South Korean civil company, who awarded Qualter Hall the prestigious contract to carry out the design and manufacture in Barnsley, then to deliver, install and commission the Funicular Railway System at the ChooChoo Park, High 1 Resort, located in Gangwon Province.

LEARN MORE

Refurbishment of Berths 3, 2 and 7 | Dover

Dover Harbour Board - Refurbishment of Berths 3, 2 & 7

Qualter Hall are carrying out major refurbishment works to three Ro-Ro Berths, 3, 2 and 7, in the Eastern Docks, Port of Dover.

LEARN MORE

Installation of Baturusa bascule bridge | Indonesia

Baturusa Bascule Bridge, Indonesia

Qualter Hall were awarded the contract for the 99.5m long by 23.2m wide, two leaf Bascule Bridge, in partnership with sister company, Waagner-Biro Indonesia.

LEARN MORE

Pedestrian swing bridge | Greenwich

Greenwich Reach Pedestrian Swing Bridge

This pedestrian/cyclist swing bridge spans across the mouth of the Deptford Creek adjacent to the River Thames, in Greenwich London, and it provides an extension to the long distance walking route along the south bank of the Thames.

LEARN MORE

Cleveland Potash, aerial view showing old tower and new headgear under construction | Boulby Mine

New Headgear at Cleveland Potash Boulby Mine

Cleveland Potash Ltd, which owns Boulby Mine, awarded this major turnkey contract to renew the Headgear to Qualter Hall. Qualter Hall used a highly specialised fast-build procedure, involving jacking and then sliding out the old structure, on polished stainless steel slide paths away from the shaft, where it was then successfully demolished.

LEARN MORE

Scale Lane Bridge at night | Hull

Scale Lane Bridge on River Hull

This new concept competition winner is a 57 metre span, 1000 tonne, pedestrian and cycle way swing bridge, connecting Scale Lane to Tower Street on opposite banks of the River Hull.

LEARN MORE

Kendal Bridge, new bridge completed | Belize

Kendal Bridge, Southern Belize

This new bridge replaces the original which was washed away during the devastating floods caused by Tropical Storm 'Arthur'. The project, undertaken on behalf of the Government of Belize, was funded by the Caribbean Development Bank.

LEARN MORE

Upgrades to controls, hydraulics and shift and latch arm mechanisms I Thames Barrier

Thames Barrier

In accordance with the Environment Agency National Contractors Framework version 2 and in association with Volker Stevin, Qualter Hall were awarded this major contract for work on the Thames Barrier

LEARN MORE