Qualter Hall were commissioned to refurbish the inner pair of Lock Sector Gates and provide a new electrical control system for the complete lock.
The scope of works included:
- Remove inner pair of lock gates
- New surface treatment of the gates
- Replacement of all seals
- Refurbishment of all winch drives
- Supply all new electrical equipment and cabling to operate full lock with new PLC control
- Re-installation of gates and equipment, and commissioning
Client: Hull City Council