Qualter Hall are carrying out major refurbishment works to three Ro-Ro Berths, 3, 2 and 7, in the Eastern Docks, Port of Dover.
LEARN MOREQualter Hall were awarded the contract for the 99.5m long by 23.2m wide, two leaf Bascule Bridge, in partnership with Waagner-Biro Indonesia.
LEARN MOREIt was POSCO Engineering, a major South Korean civil company, who awarded Qualter Hall the prestigious contract to carry out the design and manufacture in Barnsley, then to deliver, install and commission the Funicular Railway System at the ChooChoo Park, High 1 Resort, located in Gangwon Province.
LEARN MOREThis pedestrian/cyclist swing bridge spans across the mouth of the Deptford Creek adjacent to the River Thames, in Greenwich London, and it provides an extension to the long distance walking route along the south bank of the Thames.
LEARN MOREQualter Hall received a contract to carry out the M&E refurbishment and improvements to the Upper Bank Street Lift Bridge, formerly known as the Great Wharf Road Lift Bridge.
LEARN MORECleveland Potash Ltd, which owns Boulby Mine, awarded this major turnkey contract to renew the Headgear to Qualter Hall. Qualter Hall used a highly specialised fast-build procedure, involving jacking and then sliding out the old structure, on polished stainless steel slide paths away from the shaft, where it was then successfully demolished.
LEARN MOREThis new concept competition winner is a 57 metre span, 1000 tonne, pedestrian and cycle way swing bridge, connecting Scale Lane to Tower Street on opposite banks of the River Hull.
LEARN MORE