The bridge forms part of the prestigious CrossRail link project.
The scope of works included for the design, procurement, manufacture, assembly, delivery, installation and commissioning of equipment provided/refurbished, including the following:-
- Telescopic single main bridge lifting cylinder
- Hydraulic power pack complete with all pumps, valves, offline filtration, warning devices, filling points, all associated connection points and fixings
- All electrical control equipment required to operate and control the bridge, including:-
- Connection into main supply
- Distribution board
- Cable reelers
- Pump/motor control panels and PLC
- Bridge mounted transducers
- Navigation light and control system
- Control desk
- Road barriers and wig wags
- Electrical installation.
Client: Hollandia BV/Canary Wharf Contractors Ltd