Design, supply, installation and commissioning of a road swing bridge over the Gloucester and Sharpness canal at Fretherne.
This work included:
- Incorporate British Waterways structural design within a buildable proposal. Design and detailing of fabricated bridge sections, and all associated slew gear and control systems.
- Fabricate, trial assemble and calibrate bridge deck
- Complete drive and control systems
- Install all equipment onsite, on to new civil foundations, within very restricted site environment.
Client: British Waterways - Morrison