Project: Upgrade of Moving Bridges - ABP Goole Docks


more images

Qualter Hall's scope of works included on-site inspection/evaluation of part installation, completion of outstanding works on the hydraulic drive systems, supply and installation of shortfall in control systems, including main HMI unit, final commissioning of turnkey system and provision of as-built drawings and documentation.

During this process a requirement materialised to completely redesign and commission the remote control safety stop system utilising existing fibre optic communication.

Client:  Cleveland Bridge UK Ltd